ESTABLISHING DATA LINK
Connecting to Mission Control
Validating the mission scenario and preparing the flight console.
ESTABLISHING DATA LINK
Validating the mission scenario and preparing the flight console.
Connecting to the live mission session.
Simulated two-stage launch vehicle
This run is the practical completion gate for Lesson 12. Finish the investigation, resume the flight, verify orbital insertion, then return from the debrief.
Vastward records this simulated run only in this browser during the private Academy phase. It is educational evidence of completion, not flight qualification or live agency data.
Press Play to advance mission time, Pause when you need to inspect evidence, and use 1x, 2x, or 4x to change the pace. The scrubber and timeline events move every panel to the same time.
Start with mission time, flight phase, and the current objective. Then compare altitude, velocity, dynamic pressure, event timing, and data quality.
Acknowledging a warning records that you saw it; it does not solve the cause. Inspect nearby telemetry, timeline events, and logs before choosing a response.
Mission complete is not enough by itself. Open the debrief, review the evidence trail, then use the Academy return link to unlock the final reflection.
The simulated vehicle and ground systems complete their final readiness sequence.
Approximate height of the simulated vehicle above mean sea level.
Select an event to move every panel to the same mission time.